Hotline
+86-136 8495 9862
Email:cennia@szmizhi.com
Add::104,Building 27,Third Industrial Zone, Longxi Community,Longgang District,Shenzhen,China.
Coil Forming & Handling Equipment
Surface Treatment Equipment
Solutions
Application
About Us

Welcome to MIZHI
For consultation/feedback, please call the service hotline: +86-136 8495 9862 Email:cennia@szmizhi.com
1. Brief Profile of Operation & Maintenance System
The Operation Tutorial and Maintenance Protocol for the Dustless Water Sandblaster Machine is a structured guide designed to ensure safe, efficient, and consistent operation of the equipment while extending its service life. Unlike generic machine guides, this protocol is tailored to the unique characteristics of dustless water sandblasters—low-pressure wet blasting, fine abrasive handling, and precision deburring of delicate parts—and addresses the specific needs of high-tech industries (medical, aerospace, electronics) where operational accuracy and equipment reliability are critical.
The operation tutorial covers step-by-step workflows from pre-start checks to post-deburring cleanup, with a focus on parameter calibration (water pressure, abrasive flow) and part-specific settings (e.g., titanium vs. polymer parts). It emphasizes safety measures to prevent water damage to precision components and protect operators from wet-slip hazards. The maintenance section, meanwhile, outlines preventive and corrective tasks—from daily filter checks to annual pump overhauls—aligned with the machine’s component lifespans (e.g., 50–100 hours for tungsten carbide nozzles, 6–12 months for water filters).
Both sections integrate troubleshooting guides for common issues (e.g., clogged nozzles, pressure drops) and compliance checks to meet industry standards (e.g., ISO 13485 for medical device manufacturing, AS9100 for aerospace). By following this protocol, operators can minimize downtime (reducing it by 30–40% vs. unstructured maintenance), ensure consistent deburring quality, and extend the machine’s service life from 5 to 8 years. In summary, this guide is an essential tool for maximizing the machine’s performance while adhering to the strict operational requirements of precision part manufacturing.
2. Application of Operation & Maintenance Protocols
The Operation Tutorial and Maintenance Protocol is applied across all stages of the Dustless Water Sandblaster’s lifecycle, from initial setup to long-term operation, and is tailored to the diverse use cases of precision part deburring. Its flexibility ensures it meets the needs of different industries, production volumes, and part types, while its structured approach guarantees consistency and compliance. Below are its key application scenarios:
2.1 Small-Batch Precision Part Production (Medical Devices)
In medical device manufacturing (e.g., surgical instruments, orthopedic screws), small-batch production (10–50 parts per run) requires frequent parameter adjustments for different part geometries. The operation tutorial guides operators through quick setup workflows: for example, switching from deburring 3mm titanium screws (1.2 MPa pressure, 15 g/min garnet flow) to 5mm PEEK implants (0.8 MPa pressure, 10 g/min glass bead flow) in <10 minutes. The maintenance protocol emphasizes daily checks—cleaning the abrasive filter to prevent clogging (critical for micro-burr removal) and inspecting the nozzle for wear (to avoid inconsistent spray patterns). This application ensures each medical part meets sterility and precision standards (Ra ≤0.1 μm) while minimizing material waste.
2.2 High-Volume Aerospace Component Manufacturing
Aerospace facilities processing 100+ turbine blades or fuel nozzles daily rely on the protocol’s efficiency-focused workflows. The operation tutorial includes automated setup guides for robotic systems: operators load a preprogrammed “turbine blade” profile, and the PLC adjusts water pressure (2.0 MPa), abrasive flow (25 g/min), and nozzle path automatically—reducing setup time by 50%. The maintenance protocol outlines weekly tasks: calibrating the vision sensor (to ensure ±0.05mm positioning accuracy) and draining the slurry tank to remove metal debris (which can scratch blade surfaces). This application ensures high throughput without compromising aerospace-grade quality (dimensional tolerance ±0.001mm).
2.3 Cleanroom Semiconductor Part Processing
Semiconductor cleanrooms (ISO 5–ISO 8) require strict adherence to contamination control, making the protocol’s cleanroom-specific steps critical. The operation tutorial includes pre-operation cleanroom checks: wiping down the machine’s external surfaces with lint-free cloths and verifying the water filtration system (0.2 μm membrane) is functional (to prevent particle deposition on lead frames). The maintenance protocol specifies monthly filter replacements (even if not clogged) and sterile cleaning of the slurry recovery system (using FDA-approved disinfectants) to avoid cross-contamination. This application ensures semiconductor parts (e.g., 50 μm vias) remain free of abrasive or waterborne contaminants, preventing electrical failures.
2.4 On-Site Maintenance and Repair (Automotive Precision Parts)
Mobile dustless water sandblasters used for on-site repair (e.g., deburring damaged transmission gears at automotive workshops) rely on the protocol’s portable-focused guidance. The operation tutorial covers compact setup: connecting to local water sources (with a 5 μm pre-filter) and calibrating pressure for on-site power constraints (e.g., 1.5 MPa for generator-powered machines). The maintenance protocol includes field-friendly tasks: inspecting hose connections for leaks (to avoid water damage to workshop equipment) and storing abrasives in moisture-proof containers (to prevent clumping). This application ensures on-site repairs meet automotive precision standards (gear tooth tolerance ±0.002mm) with minimal disruption to production.
3. Features of Operation & Maintenance Protocol
The Operation Tutorial and Maintenance Protocol for the Dustless Water Sandblaster Machine is distinguished by features that prioritize usability, precision, and compliance—addressing the unique challenges of wet blasting for precision parts. These features ensure operators (even those with limited experience) can achieve consistent results, while the maintenance guidelines protect the machine’s delicate components (e.g., vision sensors, precision nozzles) from premature wear. Below are the key features:
3.1 Part-Specific Operational Presets and Guides
The protocol includes a library of pre-defined operational guides for common precision parts, eliminating guesswork and ensuring parameter accuracy:
Preset Parameter Charts: A quick-reference table listing optimal water pressure, abrasive type/size, and nozzle speed for 50+ part categories (e.g., “titanium turbine blade: 2.0 MPa, 120 μm aluminum oxide, 5 mm/s nozzle speed”; “PEEK medical implant: 0.8 MPa, 100 μm glass beads, 3 mm/s nozzle speed”). Each preset is validated against industry standards (e.g., ASTM F86 for medical implants) to guarantee deburring quality.
Step-by-Step Part Loading Guides: Visual diagrams (with annotations) showing how to secure different part types—e.g., using vacuum chucks for thin polymer parts (to avoid deformation) or soft-jaw clamps for titanium components (to prevent scratching). The guides also specify optimal part orientation (e.g., angling a fuel nozzle’s orifice toward the nozzle to ensure internal burr removal).
Parameter Adjustment Decision Trees: Flowcharts that help operators adapt presets to unique part variations—e.g., “if part has burrs >0.1mm, increase pressure by 0.2 MPa; if part shows surface scratching, reduce abrasive flow by 5 g/min.” This feature empowers operators to troubleshoot on the fly without compromising precision.
3.2 Preventive Maintenance Scheduling with Component Lifespan Tracking
The maintenance section uses a data-driven approach to schedule tasks based on component wear rates, maximizing uptime and reducing unexpected failures:
Lifespan-Based Checklists: Clear timelines for each component—e.g., “tungsten carbide nozzle: inspect after 20 hours, replace after 50–100 hours”; “water filter: replace every 3 months or after 100 hours of operation (whichever comes first)”; “robotic arm lubrication: every 6 months.” Each task includes a list of required tools (e.g., 2mm hex key for nozzle replacement) and safety precautions (e.g., “disconnect power before accessing the pump”).
Wear Monitoring Templates: Printable or digital forms for recording component condition—e.g., a nozzle wear log tracking inner diameter (measured with a micrometer) to detect enlargement (which causes spray pattern distortion). The template flags when wear exceeds acceptable limits (e.g., 0.1mm increase in nozzle diameter) and triggers a replacement alert.
Seasonal Adjustments: Guidelines for adapting maintenance to environmental conditions—e.g., “in high-humidity cleanrooms, inspect electrical connections weekly for corrosion”; “in dusty automotive workshops, clean the abrasive hopper vibrator monthly to prevent jamming.” This ensures the machine performs consistently across different operating environments.
3.3 Safety-Focused Procedures for Wet Blasting
Given the machine’s wet operation and precision component handling, the protocol prioritizes safety for both operators and parts:
Operator Safety Checklists: Pre-operation steps to ensure personal protective equipment (PPE) compliance—e.g., “wear nitrile gloves (to prevent slipping on wet parts), splash-resistant goggles (to protect against slurry spray), and non-slip shoes (to avoid falls on wet floors).” The checklist also includes machine safety checks: “verify emergency stop button functions (red button on HMI panel); ensure slurry tank lid is secured (to prevent splashing).”
Part Damage Prevention Guidelines: Best practices to avoid harming delicate parts—e.g., “never exceed 0.8 MPa pressure for polymer parts (risk of surface indentation)”; “test deburring on a scrap part first if processing a new component type”; “use the post-deburring rinse cycle (30 seconds at 0.5 MPa) to remove residual abrasive (prevents scratching during handling).”
Emergency Response Protocols: Step-by-step guides for common emergencies—e.g., “slurry leak: press emergency stop, isolate water supply (valve under machine), wipe up spill with absorbent pads (non-abrasive to avoid floor scratching)”; “nozzle clog: turn off water/abrasive supply, remove nozzle, clear clog with a 0.5mm wire (do not use sharp tools that damage the nozzle).” Each protocol includes contact information for technical support (for complex issues like pump failure).
3.4 Compliance Documentation and Traceability
For industries requiring strict quality records, the protocol includes tools to maintain compliance and traceability:
Process Log Templates: Digital or paper logs for recording each deburring run—e.g., “date: 10/05/2024; part ID: TB-123 (turbine blade); operator: J. Smith; parameters: 2.0 MPa, 120 μm Al₂O₃, 5 mm/s; result: burrs removed, Ra = 0.15 μm.” The log includes a signature field for quality control approval and is compatible with industry-specific software (e.g., SAP for aerospace manufacturing).
Maintenance Compliance Certificates: Forms to document completed maintenance tasks—e.g., a pump overhaul certificate signed by a certified technician, including date, parts replaced (e.g., piston seal), and test results (e.g., “pressure holds at 3.0 MPa for 5 minutes”). These certificates are critical for audits (e.g., FDA inspections for medical device facilities).
Calibration Records: Sheets for tracking equipment calibration—e.g., “pressure gauge calibrated on 09/15/2024 (standard: 2.0 MPa, measured: 2.01 MPa, within ±0.05 MPa tolerance)”; “vision sensor calibrated on 09/20/2024 (position accuracy: ±0.04mm, meets ±0.05mm requirement).” The records include calibration dates and next due dates to ensure compliance with ISO 9001.
4. Main parts of Operation & Maintenance Workflow
The Operation Tutorial and Maintenance Protocol is organized into interconnected workflow parts, each targeting a specific phase of the machine’s operation or upkeep. These parts are designed to be sequential (for operation) or cyclical (for maintenance), ensuring no critical step is missed and aligning with the machine’s component layout and functional logic. Below are the main workflow parts:
4.1 Pre-Operation Preparation Workflow
This workflow ensures the machine is ready for safe, efficient operation and that parts are properly prepared—critical for avoiding deburring errors or equipment damage:
Machine Readiness Check:
Power and Utility Verification: Ensure the machine is connected to the correct power supply (220V/380V) and that water pressure (≥0.2 MPa) and compressed air (if used) are stable. Check the HMI for error codes (resolve any before proceeding).
Fluid and Abrasive Levels: Inspect the water tank (fill to 80% capacity with clean, filtered water) and abrasive hopper (fill with the correct abrasive type/size—e.g., 100 μm garnet for aluminum parts). Verify the slurry recovery tank is empty (to prevent overflow).
Component Inspection: Check the nozzle for wear (measure inner diameter with a micrometer—replace if >0.1mm enlargement), inspect hoses for leaks (tighten connections if needed), and ensure the vision sensor (if used) is clean (wipe with a lens cloth).
Part Preparation:
Part Cleaning: Wipe down parts with a lint-free cloth to remove surface dust (prevents abrasive clogging). For oily parts (e.g., automotive gears), use a mild solvent (compatible with the part material) to remove oil—dry thoroughly.
Part Securing: Mount parts on the fixture using the appropriate method (vacuum chuck for thin parts, soft-jaw clamps for rigid parts). Ensure the part is aligned with the nozzle path (use the machine’s laser guide if available) to cover all burr-prone areas.
Preset Selection: On the HMI, select the part-specific preset (e.g., “semiconductor lead frame”) or manually input parameters (water pressure, abrasive flow, nozzle speed). Test the spray pattern on a scrap part to confirm it aligns with the part’s geometry.
4.2 In-Operation Execution Workflow
This workflow guides operators through the deburring process, with a focus on monitoring and adjusting parameters to maintain precision:
Startup Sequence:
Low-Pressure Test: Start the water pump at 50% of the target pressure (e.g., 1.0 MPa for a 2.0 MPa target) and activate the abrasive feeder at 50% flow. Check the spray pattern on the scrap part—adjust nozzle angle if needed.
Full-Pressure Activation: Gradually increase water pressure and abrasive flow to the target values. For robotic systems, start the preprogrammed nozzle path; for manual systems, hold the nozzle holder at a 45° angle to the part surface (maintain a 5–10mm distance to avoid scratching).
Process Monitoring:
Real-Time Parameter Checks: Every 5 minutes, verify water pressure (via HMI) and abrasive flow (check the feeder’s visual indicator) are stable. For critical parts (e.g., medical implants), use the vision sensor to scan for remaining burrs mid-process.
Part Inspection: Pause operation every 10 parts (or after 30 minutes) to inspect a part under a microscope. Check for burr removal (ensure no residual burrs >0.05mm) and surface roughness (use a profilometer to confirm Ra ≤0.2 μm). Adjust parameters if needed (e.g., increase pressure by 0.1 MPa for remaining burrs).
Emergency Handling: If a clog occurs (spray pattern becomes uneven), press the emergency stop, turn off water/abrasive supply, and clear the nozzle with a 0.5mm wire. If a part shifts, stop operation, re-secure the part, and restart the process from the beginning (to avoid uneven deburring).
4.3 Post-Operation Cleanup and Documentation Workflow
This workflow ensures the machine is prepared for the next use and that process records are complete for traceability:
Machine Shutdown:
Sequential Power-Off: First, stop the abrasive feeder, then reduce water pressure to 0 MPa, and turn off the water pump. For robotic systems, return the arm to the home position. Disconnect power if the machine will not be used for >24 hours.
Component Cleaning: Remove the nozzle and soak it in a mild detergent (to remove abrasive residue)—rinse and dry thoroughly. Clean the abrasive filter (tap gently to remove debris) and wipe down the fixture with a damp cloth.
Fluid Management: Drain the slurry recovery tank (dispose of slurry according to local regulations) and clean the tank with water. Refill the water tank with fresh water (if the machine will be used soon) or drain it (for long-term storage).
Documentation:
Process Logging: Record the run details in the process log (part ID, parameters, number of parts processed, inspection results). Attach a copy of the profilometer/vision sensor report (if applicable).
Quality Control Sign-Off: Submit the log to a quality control technician for review—obtain a signature to confirm compliance with standards. File the log in the machine’s documentation folder (digital or physical) for audits.
4.4 Maintenance Workflow (Preventive and Corrective)
This workflow outlines recurring maintenance tasks and steps to address common issues, ensuring the machine remains in optimal condition:
Preventive Maintenance (Scheduled):
Daily Tasks: Clean the vision sensor lens, inspect hoses for leaks, empty the slurry tank, and check abrasive filter for clogs.
Weekly Tasks: Lubricate the robotic arm joints (use food-grade lubricant for medical applications), calibrate the pressure gauge (against a standard gauge), and inspect the pump’s piston seal for wear.
Monthly Tasks: Replace the water filter, clean the abrasive hopper (remove residual abrasive to prevent clumping), and test the emergency stop system.
Annual Tasks: Overhaul the water pump (replace seals and gaskets), replace all nozzles (even if not fully worn), and recalibrate the vision sensor (by a certified technician).
Corrective Maintenance (Troubleshooting):
Common Issue Resolution:
Clogged Nozzle: If the spray pattern is uneven or stops, turn off the machine, remove the nozzle, and use a 0.5mm stainless steel wire to clear debris from the orifice. Avoid sharp tools (e.g., screwdrivers) that could widen the nozzle—this would disrupt spray uniformity. If clogging recurs, check the abrasive filter (replace if dirty) and reduce abrasive flow by 5–10 g/min.
Water Pressure Drop: If pressure falls below the set value (e.g., from 2.0 MPa to 1.5 MPa), first check the water tank level (refill if low) and inspect hoses for leaks (tighten connections or replace damaged hoses). If pressure remains low, clean the water filter (sediment buildup restricts flow) or check the pump’s piston seal (replace if worn—signs include water leakage from the pump).
Abrasive Flow Interruption: If no abrasive reaches the nozzle, verify the hopper has enough abrasive (fill if empty) and check the vibratory feeder (ensure it’s powered on—reset the HMI if it’s unresponsive). If the feeder runs but no abrasive flows, inspect the metering valve (clean if clogged with fine abrasive) and the delivery hose (clear kinks or replace if blocked).
Complex Issue Escalation: For issues like pump failure (no water flow) or vision sensor malfunction (no burr detection), stop operation immediately and contact certified technical support. Provide the machine’s serial number, error code (from HMI), and a description of the issue (e.g., “pump makes unusual noise when activated”) to speed up repairs. Do not attempt to disassemble the pump or sensor unless trained—this could void the warranty.
Post-Repair Verification: After resolving an issue, perform a test run with a scrap part. For example, after replacing a nozzle, check the spray pattern and measure surface roughness (Ra) to confirm it meets standards. Update the maintenance log with the repair details (date, parts replaced, test results) to track recurring issues (e.g., frequent nozzle clogs may indicate incompatible abrasive size).
5. Basic Parameter for Operation & Maintenance
The Basic Parameters for the Operation & Maintenance of the Dustless Water Sandblaster Machine are standardized to ensure consistency in operation, simplify troubleshooting, and extend equipment life. These parameters are tailored to the machine’s wet-blasting mechanism and precision deburring requirements, covering operational limits, maintenance intervals, and safety thresholds—critical for high-tech industries where accuracy and reliability are non-negotiable. Below are the key parameters:
5.1 Operational Parameter Limits
These parameters define the safe, effective range for machine operation, preventing part damage and equipment wear:
Water Pressure Range: 0.5–3.0 MPa (adjustable in 0.1 MPa increments). Exceeding 3.0 MPa risks surface indentation on soft materials (e.g., polymer parts), while pressures below 0.5 MPa fail to remove micro-burrs (≤0.1mm). For common materials:
Polymer (PEEK, ABS): 0.5–0.8 MPa
Aluminum Alloys: 1.0–1.5 MPa
Stainless Steel/Titanium: 2.0–3.0 MPa
Abrasive Flow Rate: 5–50 g/min (varies by abrasive type/size). Fine abrasives (50–80 μm) use 5–20 g/min (to avoid over-blasting), while coarse abrasives (120–200 μm) use 20–50 g/min (for efficient burr removal). Exceeding 50 g/min causes excessive slurry buildup (clogs the recovery system), while rates below 5 g/min result in incomplete deburring.
Nozzle Distance & Angle: Maintain a 5–10mm distance between the nozzle and part surface (prevents scratching) and a 45° angle to the burr location (optimizes abrasive impact). Deviating from this range—e.g., holding the nozzle <5mm from the part—can create surface grooves (Ra >0.2 μm), while distances >10mm reduce deburring efficiency.
Cycle Time per Part: 30 seconds–5 minutes (depends on part size and burr severity). Small parts (e.g., 5mm medical screws) take 30–60 seconds, while large parts (e.g., 300mm turbine blades) take 3–5 minutes. Extending cycle time beyond 5 minutes increases water consumption and risks part corrosion (for uncoated metals).
5.2 Maintenance Interval Parameters
These parameters establish fixed schedules for preventive tasks, ensuring components are serviced before wear causes failures:
Daily Maintenance Tasks: To be performed at the start/end of each shift (total time: 10–15 minutes):
Clean vision sensor lens (if used): Wipe with a lint-free lens cloth (avoids scratches).
Inspect hoses: Check for leaks, cracks, or kinks—replace if damage is >5mm in length.
Empty slurry recovery tank: Dispose of slurry per local regulations (e.g., industrial waste disposal for metal-containing slurry).
Weekly Maintenance Tasks: To be completed once per 5–7 days of operation (total time: 30–45 minutes):
Lubricate robotic arm joints: Apply 2–3 drops of food-grade lubricant (for medical use) or mineral oil (for industrial use) to each joint—prevents rust and ensures smooth movement.
Calibrate pressure gauge: Compare readings to a certified standard gauge (accuracy ±0.01 MPa). Adjust the gauge if the difference exceeds ±0.05 MPa.
Inspect pump piston seal: Check for water leakage (a few drops per minute is normal; replace if leakage >10 drops/minute).
Monthly Maintenance Tasks: To be done once per 20–30 days of operation (total time: 1–1.5 hours):
Replace water filter: Swap out the 0.2 μm membrane filter (even if not visibly dirty—sediment buildup reduces flow over time).
Clean abrasive hopper: Remove residual abrasive (use a soft brush to avoid scratching the hopper), then wipe the interior with a damp cloth—prevents abrasive clumping.
Test emergency stop system: Press the emergency stop button during a test run—machine should shut down within 1 second. Verify all power (water pump, feeder) is cut off.
Annual Maintenance Tasks: To be performed by certified technicians once per year (total time: 4–6 hours):
Overhaul water pump: Disassemble the pump, replace worn seals/gaskets (kit includes 2 piston seals, 4 O-rings), and clean internal components (e.g., valves) to remove scale.
Replace nozzles: Even if nozzles show minimal wear, replace them (tungsten carbide: 50–100 hours service life; sapphire: 200–300 hours) to maintain spray consistency.
Recalibrate vision sensor: Use a calibration plate (with known burr sizes: 0.05mm, 0.1mm) to adjust the sensor’s detection threshold—ensures it accurately identifies micro-burrs.
5.3 Safety & Compliance Parameters
These parameters ensure operation meets industry safety standards and regulatory requirements, protecting operators and parts:
Operator PPE Requirements: Mandatory equipment to prevent injury:
Splash-resistant goggles (ANSI Z87.1 compliant): Protects eyes from slurry spray.
Nitrile gloves (8–10 mil thickness): Prevents slipping on wet parts and chemical exposure (e.g., from mild solvents).
Non-slip shoes (ASTM F2913 compliant): Reduces fall risk on wet workshop floors.
Earplugs (NRR 20+): For machines with noise levels >75 dB(A) (common in robotic systems).
Part Compatibility Limits: Ensure parts meet size/weight constraints to avoid fixture damage:
Maximum Part Weight: 5 kg (for manual systems) / 20 kg (for robotic systems with reinforced fixtures). Exceeding this risks fixture deformation or nozzle path misalignment.
Minimum Part Size: 5mm × 5mm × 1mm (smaller parts are hard to secure and may be damaged by spray).
Environmental Compliance Parameters:
Water Consumption: ≤10 L/h (standard machines) / ≤20 L/h (large robotic machines). With closed-loop recovery, net consumption ≤4 L/h—meets EPA water efficiency standards for industrial equipment.
Dust Emission: ≤0.5 mg/m³ (measured at operator workstation)—complies with OSHA’s respirable dust limit (5 mg/m³) and cleanroom requirements (ISO 8–ISO 5).
Slurry Disposal: pH range 6–8 (neutral) to avoid environmental harm. For metal-containing slurry (e.g., titanium burrs), dispose of via licensed hazardous waste handlers—complies with RCRA (US) or REACH (EU) regulations.
These Basic Parameters provide a clear framework for safe, efficient operation and proactive maintenance of the Dustless Water Sandblaster Machine. By adhering to these limits—from operational pressure ranges to annual calibration schedules—operators can ensure consistent deburring quality, minimize downtime, and extend the machine’s service life, all while meeting the strict standards of precision manufacturing industries.